Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Sheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 04/25/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .Last Updated: 04/25/2024 Category: County Facilities Current Phase: Construction
This 12,000 square foot three-bay facility will be a state-of-the art with hurricane impact rated bi-fold doors for additional protection. Interior build-out has started.Babcock Ranch CCSO District 5 Office
Last Updated: 04/25/2024 Category: County Facilities Current Phase: Construction
The 12,000 square foot building shell has been completed by Kitson Partners of Babcock Ranch in partnership with Florida Premier Contractors. The interior work has started.Last Updated: 04/23/2024 Category: Roadway Current Phase: Planning and Project Approval
Flamingo/Edgewater Widening
Last Updated: 04/23/2024 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043, #014069
Last Updated: 04/23/2024 Category: Bridges Current Phase: Design Development
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Last Updated: 04/23/2024 Category: Utilities Current Phase: Planning and Project Approval
This project includes extending sewer lines to provide service to certain developed properties within five project areas along the improved US 41 Corridor.
East Port Water Reclamation Facility Expansion
Last Updated: 04/23/2024 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Riverside Boat Ramp Replacement
Last Updated: 04/22/2024 Category: Parks And Recreation Current Phase: Design Development
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.