Sewer Service

Sewer Backup Emergency

Call  941.764.4300 (there is no charge for our 24/7 response service)

公用事业人员将调查是否是欧博体育官网公用事业公司或房主的问题(如果是房主的问题,需要打电话给水管工)。. 如果在欧博体育官网公用事业公司调查之前叫来了水管工, the homeowner will be responsible for the plumbing costs, even if it is found to be a Charlotte County Utilities issue. 

Request New Sewer Service

  • 如果该物业还没有下水道服务,但已经毗邻现有的下水道管道, it may take two to three months to install a new service. 
  • If the property is in one of these projects in the planning stage, sewer construction may begin once approved. For more information, visit the Utilities Projects page.
  • Check the proximity to existing green or gold sewer lines on our Interactive Utilities Map.
  • 请注意,现有线路的地图不反映目前正在建设或设计中的新项目.
  • To proceed with an availability request, fill out and submit this Availability Request Form.
  • For additional questions, contact Administrative.Assistants@CharlotteCountyFL.gov or call 941.764.4300, Option 3.

Mandatory Status

​If the property is considered a mandatory connection, 一旦线路安装完毕并获得使用认证,业主将收到一封信. If sewer is considered available as defined by Charlotte County Code Sec. 3-8-41, the owner will be legally required to pay utility connection fees. For homeowners, 强制连接是指污水收集线存在于地役权或路权附近的财产线, 对于非住宅物业来说,它距离物业线不到50英尺.

业主将有180天的时间从收到之日起支付接入费并完成与住宅的连接. If the owner does not pay the connection fees to the Utilities Department, 留置权将被置于该财产上,并在法院书记官的正式记录中存档. After the initial 180-day period, 每月的下水道基础设施费用也将开始增加,并将在下一个结算期出现在账单上. 未能支付这些费用将导致启动欧博体育官网公用事业公司的拖欠程序.

For additional questions, contact Administrative.Assistants@CharlotteCountyFL.gov or call 941.764.4300, Option 3.

Connection Fee Payments

​Utility connection fees are subject to change based on the approved rate resolution at the time of the agreement to activate service.

Full Payment 
邮寄付款或到我们的办公室支付全部的公用事业接驳费. Paying up front will lock in the current rate and save additional time, interest and fees in the future.

Loan Financing
已收到强制接驳通知书而无力支付公用事业接驳费的业主,可能有资格申请每月贷款. 公用事业部门要求首付至少为应付金额的10%, and will record a lien on the property. Monthly payments are paid for 7, 10, 15年或20年,利率等于佛罗里达优惠利率加2%.

Tax Bill Assessment
Several areas were approved for Municipal Service Benefit Unit (MSBU) sewer expansion projects. 评估分为物业业主的年度税款. The assessment stays with the property once it is sold, and does not need to be paid at the time of sale.

The property may be connected to sewer if in one of our current project areas. Visit the project-specific page for the most recent status. If the property is in one of these projects in planning stage, sewer construction may begin once approved.

Physical Connection

我们的服务区域有三种不同类型的下水道系统连接到我们的废水处理设施. 业主不能选择下水道类型,因为这取决于物业的位置和与现有基础设施的接近程度. 每种服务类型都有不同的流程和房主在物理连接家庭方面的责任.


Low Pressure Sewer (LPS)


用户责任:您有责任聘请电工按照我们的要求安装电气面板和专用断路器 standards.
LPS is a low-head pressure waste collection and treatment system. The system basically consists of a control panel, an interceptor tank, and sump chamber unit which houses a small sewage effluent pump. 污水排出泵将液体废水(出水)通过小压力管线输送到主压力管线,并进入我们的一个污水设施进行最终处理. 留在每个房主的LPS水箱中的固体废物自然降解.

从污水池到污水处理厂的系统由公用事业署维护, including parts and labor costs. This includes the pumping out of the tank if solids build up. 然而,房屋管道问题是客户的责任.

For existing homes (not new construction), 我们的现场技术人员将在支付公用事业连接费用后与业主联系,为LPS服务提供电气面板. 业主有责任聘请电工按照我们的要求安装电气面板和专用断路器 standards. Once the electrical work passes inspection, our staff will place the address on their schedule to complete the work. This service can take up to 6 weeks or more to complete.

The LPS utility connection fees currently include connection to the home, 废弃目前的化粪池系统,对院子进行基本修复. Please see the approved rate resolution and call Engineering Services at 941.764.4300, Option 3 to confirm the costs for the property.

Informative LPS Publications:
FAQs About LPS Connection
LPS Homeowner Guide

Gravity Sewer


客户责任:您有责任聘请水管工来完成与您家的连接, 放弃现场化粪池系统,并向公用事业公司提供化粪池废弃许可证.
这是传统的下水道系统,由从建筑物到一个或多个更大的地下主干的管道组成, and above-ground lift stations, which transport the sewage to wastewater treatment facilities. 垂直管道,通常由预制混凝土制成,称为人孔,将主水管连接到地面.

从街道到污水处理厂的下水道系统由公用事业署维护, including parts and labor costs. However, house plumbing problems are the responsibility of the customer.

Once the utility connection fees have been paid, 业主有责任聘请水管工完成与房屋的连接,并放弃现场化粪池系统. Once the plumber has completed the connection, 业主或水管工必须与公用事业部门联系,让我们知道连接已经完成. A septic tank abandonment permit # must also be provided to Utilities.

Please see the approved rate resolution and call Engineering Services at 941.764.4300, Option 3 to confirm the costs for the property.

FAQs about connecting to the gravity sewer system.

Vacuum Sewer


Vacuum sewer systems incorporate new technology that exists in the East & West Spring Lake, El Jobean and Ackerman project areas. In this case, a central vacuum station is serving up to 1,900 homes which feed into our central wastewater system.

These property owners have the option to pay their utility connection fees, 物理连接费和化粪池弃置费预先支付或通过20年的年度税单评估.

由于评估包括物理连接和化粪池遗弃, property owners do not need to hire a plumber.

Future Availability 

In October 2016, Charlotte County Utilities began developing its Sewer Master Plan (CCSMP), 欧博体育官网下水道和污水处理系统未来发展的路线图是什么. The CCSMP 能否确定未来5到10年优先发展的地理区域.

Sewer Master Plan Resources and Updates

In addition to those priority areas, 公用事业公司还在扩建线路,以连接靠近现有线路的新住宅. 一旦线路建成,沿线的属性将转变为强制状态, regardless of whether the owner requested the service.

To proceed with an availability request, fill out and submit this Availability Request Form. For additional questions, contact Administrative.Assistants@CharlotteCountyFL.gov or call 941.764.4300, Option 3.

Delivering Exceptional Service

Questions? Issues?

Contact Us